Data center projects don’t fail because of one big issue. They fail because of coordination breakdowns. Electrical, mechanical, and plumbing systems all need to be installed in tight, shared spaces. Each trade depends on the one before it. When that sequence breaks, everything slows down. A cable tray install gets delayed. That pushes mechanical. That blocks another trade. Suddenly, an entire zone is out of sync. Traditional schedules don’t capture this level of dependency. T