The Commissioning Cliff: Avoiding the End-of-Project Crunch

  • Writer: Valeria Valenzuela
    Valeria Valenzuela
  • Dec 19, 2025
  • 1 min read

 Every owner knows the truth: RFS dates don’t slip in structure—they slip in commissioning.

The “commissioning cliff” kills speed, predictability, and revenue.

inTakt integrates L2–L5 testing directly into the takt flow so Cx becomes continuous, stable, and on time.

This is how hyperscale teams avoid late-project chaos—and protect their revenue dates.